PPT Slide
E
W
9.18/4.3
2.6/10.1
10.1/0.9
5.12/2.5
4.31/2.3
5.43/3.2
3.3/5.7
Open Pit
Resource
Ultramafic
Iron Formation
1996 Resource
1997 Resource
Additions
Grams Au/T /Metres
5.12/2.5
?
27.1/20.0
250W
50W
-100M
-200M
New
Conceptual
Open Pit
4.0/2.4
4.8/3.5
?
Third Portage Deposit
Central Sector 0+65N
legend
Previous slide
Next slide
Back to first slide
View graphic version