PPT Slide
Meadowbank Project
Third PortageSurface OreExtrapolation
TRENCH “D”
TRENCH “E”
TRENCH “F”
TRENCH “H”
TRENCH “C”
4.54g/2.66m
3.88g/3.03m
3.39g/4.01m
12.17g/5.53m
17.3g/3.55m
4.58g/2.06m
7.89g/11.66m
5.09g/1.68m
7.72g/6.46m
6.46g/13.99m
9.37g/2.24m
4.90g/1.77m
7.79g/21.10m
15.35g/3.63m
3.47g/2.45m
3 + 80 N
3 + 00 N
2 + 00 N
1 + 00 N
9.60g/7.07m
8.86g/5.64m
9.41g/3.62m
3P2 GRID
2.43g/3.58m
TRENCH “D”
NORTH EXT.
16.40g/4.33m
Previous slide
Next slide
Back to first slide
View graphic version